Power on your site, from day one.
Rent a site board for your new build or renovation. We install it, help with the inspection and collect it when your site is finished.
Always in stock
More than 200 site boards, so we act fast for every project.
Fully checked
Tested and cleaned after every rental, faulty parts replaced.
Ready for inspection
Every board meets the requirements of your grid operator.
Large or small: it depends on your meter
No electricity connection yet? Then your meter goes into our large site board. Is there already a meter? Then a small one will do.
Large site board
For new builds, without an existing meter.
- 25D60 or 25S60 meter box: your grid operator installs the meter in our board
- Earth disconnector and residual current device
- Earthing via loop or temporary earth rod
- 7 types, up to 100 A
Small site board
For renovations, on an existing meter.
- Connected to your existing meter box
- Only when the building is wind- and watertight
- Residual current device included
- 3 types: single-phase, 3×230 V and 3×400 V+N
How it goes, in 7 steps
From your request to the settlement of your deposit. Each step shows who is in charge.
Send the information
Send us the details from the checklist, so we can make a correct quote.
YouAgreement & first invoice
Sign the quote online. The first invoice, with 6 months of rent, the deposit and the installation, is paid before installation.
You UsInstallation
We install the board with a cable to the building line, or you collect it from our warehouse.
UsInspection
An accredited body inspects the board. We can arrange it for you.
Inspection bodyConnection
After the inspection, you request the connection from your energy supplier.
You Grid operatorEnd of rental
Report the end via our form. We collect the board, or you bring it back.
You UsCheck & settlement
We test the board and refund the deposit, minus any costs and remaining rent.
UsIs your board staying longer?
After the first 6 months, we invoice every 6 months in arrears. You don't need to do anything.
What do we need from you?
With these details we make a correct quote in one go. Not sure? Fill in what you know, we check the rest.
About the cable
The cable on our quote is the standard cable. Check in your grid operator's quote which type of cable and which extra length is required, and let us know. Another cable is possible, at the daily price.
Your grid operator's quoteSo we know which type of connection and supply cable is needed.
Is there an earth loop?If not, we provide a temporary earth rod.
The cable length neededThen we deliver the right length straight away.
Site finished?
End your rental with your invoice number. Choose whether we collect the board or you bring it back.
Questions? We're happy to help.
Call, e-mail or send a WhatsApp. We reply as soon as possible.
Call us
E-mail us
Warehouse
Brandstraat 22
9100 Sint-Niklaas
Visit us in Sint-Niklaas
Brandstraat 22
9100 Sint-Niklaas
Collecting or returning a board is possible by appointment. Call or e-mail us beforehand.
