Skip to Content
Site boards for rent across Belgium

Power on your site, from day one.

Rent a site board for your new build or renovation. We install it, help with the inspection and collect it when your site is finished.

200+site boards in use
from € 15per month, excl. VAT
6 monthsminimum rental period
Large site board on a building site at sunset
Inspected to AREI/RGIECompliant with Synergrid C1/106

Always in stock

More than 200 site boards, so we act fast for every project.

Fully checked

Tested and cleaned after every rental, faulty parts replaced.

Ready for inspection

Every board meets the requirements of your grid operator.

Which site board do you need?

Large or small: it depends on your meter

No electricity connection yet? Then your meter goes into our large site board. Is there already a meter? Then a small one will do.

Large site board

Large site board

For new builds, without an existing meter.

  • 25D60 or 25S60 meter box: your grid operator installs the meter in our board
  • Earth disconnector and residual current device
  • Earthing via loop or temporary earth rod
  • 7 types, up to 100 A
from € 15/ month excl. VAT · deposit € 500
Small site board

Small site board

For renovations, on an existing meter.

  • Connected to your existing meter box
  • Only when the building is wind- and watertight
  • Residual current device included
  • 3 types: single-phase, 3×230 V and 3×400 V+N
€ 50/ 6 months excl. VAT · deposit € 250
How it works

How it goes, in 7 steps

From your request to the settlement of your deposit. Each step shows who is in charge.

Send the information

Send us the details from the checklist, so we can make a correct quote.

You

Agreement & first invoice

Sign the quote online. The first invoice, with 6 months of rent, the deposit and the installation, is paid before installation.

You Us

Installation

We install the board with a cable to the building line, or you collect it from our warehouse.

Us

Inspection

An accredited body inspects the board. We can arrange it for you.

Inspection body

Connection

After the inspection, you request the connection from your energy supplier.

You Grid operator

End of rental

Report the end via our form. We collect the board, or you bring it back.

You Us

Check & settlement

We test the board and refund the deposit, minus any costs and remaining rent.

Us

Is your board staying longer?

After the first 6 months, we invoice every 6 months in arrears. You don't need to do anything.

Request a quote
Preparation

What do we need from you?

With these details we make a correct quote in one go. Not sure? Fill in what you know, we check the rest.

About the cable

The cable on our quote is the standard cable. Check in your grid operator's quote which type of cable and which extra length is required, and let us know. Another cable is possible, at the daily price.

Checklist
  • Your grid operator's quoteSo we know which type of connection and supply cable is needed.
  • Is there an earth loop?If not, we provide a temporary earth rod.
  • The cable length neededThen we deliver the right length straight away.
Everything at hand? Request your quote and add your grid operator's quote.

Site finished?

End your rental with your invoice number. Choose whether we collect the board or you bring it back.

End rental

Questions? We're happy to help.

Call, e-mail or send a WhatsApp. We reply as soon as possible.

See the frequently asked questions

Warehouse

Brandstraat 22
9100 Sint-Niklaas

Map of Sint-Niklaas with our warehouse in Brandstraat
Werfkast-verhuur
© OpenStreetMap
Our warehouse

Visit us in Sint-Niklaas

Brandstraat 22
9100 Sint-Niklaas

Collecting or returning a board is possible by appointment. Call or e-mail us beforehand.