Inspection & installation
Before you have power, your site board must be installed, inspected and connected. We install the board and arrange the inspection if you wish.
Connected in three steps
The grid operator only connects your board with a valid inspection certificate. So request your board in time, and we'll plan everything together.
Install
The board is placed on your site and earthed: on the earth loop of your new build, or with a temporary earth rod. We do it for you, or you install it yourself.
Us or youInspect
An accredited inspection body inspects the board on site. If everything is in order, you receive an AREI certificate of conformity. We can arrange the inspection for you.
Inspection bodyConnect
With the certificate you request the connection. The grid operator installs the meter in our board and you have power.
You Grid operator
We install, or you do it yourself
We install the site board
We bring the board to your site and get everything ready for the inspection.
- Delivery and installation on your site
- Supply cable to the building line, in the type and length of your grid operator
- Connecting the earthing: earth loop or temporary earth rod
- At the end, we collect the board again
Install it yourself
You collect the board from our warehouse in Sint-Niklaas, by appointment.
- Collection and return by appointment
- The large board has its own stand, no wall or post needed
- The small board is connected to your existing meter box, only when the building is wind- and watertight
- Inspection remains mandatory, also when you install yourself
Our site boards meet every requirement
Whether your grid operator is Fluvius, Sibelga, ORES or RESA: the requirements for a site board are almost the same. This is how we meet them.
| Grid operator requirement | With us |
|---|---|
| 25D60 meter box, with a space of 700 × 300 × 270 mm for the base module | In the board |
| Protection rating IP43-D and IK08 | In order |
| Lockable, with warning signsAREI Book 3, section 9.4.1 | 2 locks, 2 keys |
| Placed against a wall or post, or on a stand | Own stand |
| Compliant with Synergrid C1/106 and AREI | In order |
| EarthingLarge board: earth disconnector. Small board: earth terminal strip. | In the board |
| Original and valid inspection report, for the requested power | Via the inspection |
Inspection is mandatory
To start safely, the board must be inspected after installation by an accredited inspection body. Only with the AREI certificate of conformity will the grid operator connect your board.
We guide you through the inspection process and plan the inspection if you wish, so you can start your building or renovation works quickly.